top of page
Brockville Bathroom Upgrade
RenoMasters worked their magic to transform this bathroom into an impeccable space.
After the demolition, the bathroom underwent re-gibbing and waterproofing to prepare for the installation of new bathroom fittings. A non-load bearing wall was removed to extend the bathroom and new insulation was installed behind all walls to ensure heat is retained.
The homeowners can now enjoy a comfortable atmosphere created by brand new vinyl flooring, vanity, shower, bath, toilet, and captivating feature tiling above the bath and vanity.
Next door, the separate toilet was converted into a laundry with new green cabinetry, sink, tiled backsplash and an additional toilet.
bottom of page